Engineering field

Function

Main activity

Project

Airports

Acceptance control site laboratory

Asphalt, earthworks, concrete

Upgrading of Walvis Bay Airport.

Airports

Pavement investigation

Asphalt core drilling

Walvis Bay International Airport  – drilling of 930 asphalt cores.

Airports

Acceptance control site laboratory

Asphalt, earthworks

Rehabilitation of Runways, Taxiways and Related Works at Hosea Kutako International Airport for Namibia Airports Company NAC/OPS/02/B/405/09.

Airports

Pavement investigation

Asphalt core drilling, texture depth

Hozea Kutako International Airport – drilling of asphalt cores and texture depth tests (sand patch).

Airports

Acceptance control site laboratory

Earthworks, asphalt, concrete

Upgrading and rehabilitation of Walvisbay Airport.

Airports

Geotechnical investigation

Plate load testing

New Government Hangar at Eros Airport, Windhoek (in association with ARQ)

Airports

Geotechnical investigation

Test pitting

Swakopmund Airport Main Runway (in association with ARQ)

Airports

Material survey

Borrow pit

Upgrading of Walvis Bay Airport

Airports

Material survey

Borrow pit & centerline

Upgrading of Walvis Bay Airport.

Airports

Aerial photography

 

Lüderitz Aerodrome, black & white 1:10 000 orthophoto’s

Airports

Topographical Survey

 

Upgrading of Walvis Bay Airport

Bridges

Acceptance control site laboratory

Concrete, earthworks

Construction of Three Bridges on DR2102 Ovitoto – Otjozondjupa Region.

Bridges

Acceptance control site laboratory

Concrete, earthworks

Construction of 2 Bridges for the New Railway Line between Ondangwa and Oshikango.

Bridges

Geotechnical investigation

Rotary core drilling

Construction of the Pipe Bridge across the Swakop River: Swakop South Water Supply Scheme (in association with ARQ)

Bridges

Geotechnical investigation

Dynamic Penetrometer Super Heavy

New Bridge site for the access road for Swakop Uranium Husab Mine

Buildings

Geotechnical investigation

Test pitting

New development on erf 6341, Feld street, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling & CSW

Extensions to National Council, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling & CSW

G.M.H.R Development, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling

New “City Junction” Development on Erf 246, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling

New Multi Storey Office Building for the Ministry of Home Affairs on Erf 6971, Hosea Kutako Drive, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling

Extensions to the Ministry of Labour and Social Welfare Head Office, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Dynamic Penetrometer Super Heavy

New Jimmey Construction Offices in Lazarett Street, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

 

Namibia Development Corporation Site in Tsumeb

Buildings

Geotechnical investigation

Rotary core drilling

Construction of Auas Valley Shopping Mall, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling

New Head Office for the Namibia Airports Company located at Eros Airport, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Rotary core drilling

New Head Office for NAMPOL located in Jan Jonker Street, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

New Head Office for the Ministry of National Service, Youth and Sport, Katutura, Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

Upgrading of Anderson Gate and Galston Gate in Etosha Park (assist Kantey & Templer)

Buildings

Geotechnical investigation

Continuous Surface Wave testing

New Windhoek Mayor’s Office at the Municipal Offices in Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Dynamic Penetrometer Super Heavy

New office development in Ballot Street and feed mill at the new poultry farm (Element)

Buildings

Geotechnical investigation

Test pitting

New Blue Marine / Bidvest Warehouse in Windhoek (in association with Blue Rock)

Buildings

Geotechnical investigation

Test pitting

New Development for the Millenium Challenge Account at Helao Nafidi, Oshakati & Gobabis (in association with Blue Rock)

Buildings

Geotechnical investigation

Continuous Surface Wave testing

New UNAM Medical Faculty in Windhoek (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

New Carl List House Building (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

Extentions to Wernhill Shopping Centre (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

New Auditor General building located in Robert Mugabe Ave, Windhoek

Buildings

Geotechnical investigation

Test pitting

New Additional Office Accommodation Ministry of Finance Windhoek located in Robert Mugabe Ave, Windhoek (in association with Geologic Solutions)

Buildings

Geotechnical investigation

Test pitting

New buildings located at the Suiderhof Army Base (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

New shopping centre on erven 6229 and 6230 Ongwediva (in association with ARQ)

Buildings

Geotechnical investigation

Dynamic Cone Penetrometer

Severe deformation at the Standard Bank building in Oshakati (in association with ARQ)

Buildings

Geotechnical investigation

Test pitting

New training facility at the Okahandja Military Base (in association with ARQ)

Buildings

Geotechnical investigation

Plate load testing

New City Council office in Oshakati (in association with Geologic Solutions)

Hydrological

Aerial photography

 

Oshakati – Ogongo canal, black & white 1: 6 000 – Namwater

Mining

QA/QC site laboratory

Earthworks, concrete, seals

Construction of B2 Gold mining infrastructure Otjozondjupa Region.

Mining

Process control site laboratory

Earthworks, concrete

Construction works for the upgrading of Tsumeb Smelter.

Mining

Audit function site laboratory

Earthworks, concrete

Construction of the maxi pad as well as other infrastructure for AREVA at Trekkopje Uranium Mine.

Mining

Process control site laboratory

Earthworks, concrete

Construction of the Water Pipeline from Swakopmund to Trekkopje Uranium Mine.

Mining

Process control site laboratory

Earthworks

Construction of the New Tailings Dam at Langer Heinrich Uranium Mine.

Mining

Process control site laboratory

Earthworks, concrete

Construction of the Water Pipeline from Swakopmund to Langer Heinrich Uranium Mine.

Mining

QA/QC site laboratory

Earthworks, concrete

Main contract for acceptance control testing for Anglo Base at the Skorpion Zinc project near Rosh Pinah. (3.2 BN$)

Mining

Process control site laboratory

Earthworks, concrete

Construction of the new pipeline and reservoirs for Skorpion zinc. (45 km)

Mining

Geotechnical investigation

Plate load testing

New structures at Tsumeb Smelter for GI Construction, Tsumeb

Mining

Geotechnical investigation

Rotary core drilling

Additional Swakop Uranium Husab Mine relocated structures (in association with ARQ)

Mining

Geotechnical investigation

Test pitting

Swakop Uranium Husab Mine infrastructure and bulk water supply pipeline (in association with ARQ)

Mining

Geotechnical investigation

Plate load testing

New reagents plant for Areva Trekkopje Uranium Mine (Jones & Wagener)

Mining

Geotechnical investigation

Test pitting

Trekkopje Uranium Heap Leach Maxi Pad (in association with ARQ)

Mining

Geotechnical investigation

Test pitting

New water pipeline, booster sites and reservoir sites from the desalination plant at Wlotzkabaken to the new uranium mine at Trekkopje (in association with Geologic Solutions)

Mining

Material survey

Borrow pit & centerline

Proposed new access road to Swakop Uranium Husab mine

Mining

Topographical Survey

 

Quantitative survey at Otjihase mine

Mining

Topographical Survey

 

Proposed new sites for Kudu Gas to Power project

Mining

Topographical Survey

 

New site at Skorpion Zinc, Rosh Pinah

Ports

Geotechnical investigation

Seismic refraction and topographical survey

Pre-feasibility study for the new harbour development at Cape Fria in the Skeleton Coast Park (in association with Geologic Solutions)

Railways

Process control site laboratory

Aggregate

Production of 100,000 m3 railway ballast for the Northern Region Railway Project at Ongopolo Mine in Tsumeb.

Railways

Acceptance control site laboratory

Earthworks, concrete

Construction of the New Railway Line between Ondangwa and Oshikango (60 km).

Railways

Process control site laboratory

Aggregate

Production of 130,000 m3 railway ballast at Keetmanshoop for the railway between Aus and Lüderitz.

Railways

Process control site laboratory

Earthworks, concrete

Construction of the railway between Aus and Luderitz.

Railways

Acceptance control site laboratory

Earthworks, concrete

Construction of the railway line between Tsumeb and Ondangwa (3x on site laboratories). (245 km’s)

Railways

Process control site laboratory

Aggregate

Production of 100,000 m3 railway ballast at Aris for the Northern Region Railway Project.

Railways

Geotechnical investigation

Continuous Surface Wave testing

Transnamib Station Development, Windhoek (in association with ARQ)

Railways

Material survey

Borrow pit & centerline

Rehabilitation and upgrading of the railway line between Kranzberg and Tsumeb (400 km’s)

Railways

Material survey

Borrow pit

Construction of New railway line between Ondangwa and Oshikango. (60 km’s)

Railways

Material survey

Borrow pit & centerline

Construction of new railway line between Tsumeb and Ondangwa. (245 km’s)

Railways

Aerial photography

 

Namibia Northern Railway Extension: Ondangwa to Skeleton Coast, colour 1:20 000  orthophoto’s including 2 x 10 km strips north and south of Cape Fria

Railways

Aerial photography

 

1:40 000 colour orthophoto’s, Katima Mulilo to Ohangwena and Rundu to Grootfontein

Railways

Aerial photography

 

1:10 000 colour orthophoto’s, 2 strips of area south of the road between Oshakati and Ondangwa

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of MR91 Gobabis – Aminius – Aranos 243 km, Omaheke and Hardap Regions.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of DR3609 Oshakati – Omungwelume – Ongenga 37.5 km, Omusati Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of DR3608 Outapi - Omafo – Omusati Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of MR67 Omakange - Ruacana – Omusati Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of DR3524 Ngoma – Nakabolelwa – Caprivi Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of MR125 Kongola – Linyanti – Caprivi Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of DR3673 Omuthiya - Onanke – Oshana Region.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of labour based project DR3610 Mangetti – Oshana Region.

Roads

Process control site laboratory

Earthworks, concrete, seals

Construction of TR15/1 between Tsumeb and Katwitwi.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of TR14/02 (Gobabis-Drimiopsis-Otjinene) 150 km.

Roads

Process control site laboratory

Earthworks, concrete, seals

Upgrading and rehabilitation of TR7/1 Okahandja to Wilhelmstahl.

Roads

Acceptance control site laboratory

Earthworks, concrete

Construction of Caprivi Labour Based Projects DR3502, DR3507 and Sachinga Quarantine Road (totaling 60 km).

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Construction of MR67 Kamanjab to Omakange Phases 1 and 2.

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Rehabilitation and upgrading of MR 100 between Opuwo and MR 67 Junction (60 km).

Roads

Process control site laboratory

Earthworks, concrete, seals

Rehabilitation of TR1/11 from Ondangwa to Oshikango. (60km)

Roads

Acceptance control site laboratory

Earthworks, concrete, asphalt

Rehabilitation and upgrading of TR 1/5 between Windhoek and Aris. (18 km’s)

Roads

Acceptance control site laboratory

Earthworks, concrete, seals

Rehabilitation and upgrading of TR 1/7 between Okahandja and Otjiwarongo. (175 km’s)

Roads

Geotechnical investigation

Test pitting

Access Road and Rail for Swakop Uranium Husab Mine (assist Jones & Wagener)

Roads

Material survey

Borrow pit & centerline

Construction of MR91 (Gobabis-Aminius-Aranos) 243 km.

Roads

Material survey

Borrow pit & centerline

Construction of DR3609 (Oshakati-Omungwelume-Ongenga) 37.5 km.

Roads

Material survey

Borrow pit

Construction of MR67 (Omakange to Ruacana) 85 km.

Roads

Material survey

Borrow pit

Construction of DR3608 (Outapi to Omafo) 80 km.

Roads

Material survey

Borrow pit & centerline

Construction of MR125 (Kongola to Linyanti) 115 km.

Roads

Material survey

Borrow pit & centerline

Construction of TR14/02 (Gobabis-Drimiopsis-Otjinene) 150 km.

Roads

Material survey

Borrow pit

Labour based project DR3673 Omuthiya - Onenke - Ovamboland.

Roads

Material survey

Borrow pit

Labour based project DR3610 Mangetti - Ovamboland.

Roads

Material survey

Borrow pit

Construction of Caprivi Labour Based Projects DR3502, DR3507 and Sachinga Quarantine Road (totaling 60 km).

Roads

Material survey

Borrow pit & centerline

Consrtruction of MR120 (Okatana – Endola – Onuno) and MR123 (Outapi – Tsandi – Junction MR122)

Roads

Material survey

Borrow pit

Construction of MR100 from MR 67 to Opuwo. (55 km)

Roads

Material survey

Borrow pit & centerline

Construction of MR67 from Kamanjab to MR122 Junction. (220 km)

Roads

Material survey

Borrow pit & centerline

Construction of MR122 from Okahao  to MR67 Junction. (109 km)

Roads

Material survey

Borrow pit

Rehabilitation of TR1/7 Okahandja to Otjiwarongo. (174 km)

Roads

Topographical Survey

 

Secondment of surveyor for the new road between Opuwo and Omakange MR100

Special projects

 

 

WMF Werewolf Project- responsible for site preparation and civil works during the mine blast project with the objective to investigate Werewolf MKII compliance to NATO PIP specifications

Streets

Acceptance control site laboratory

Bitumen stabilized materials

City of Windhoek Resealing of Streets in Windhoek – TRA/146/2012 BSM Cold Insitu Recycling.

Streets

Acceptance control site laboratory

Asphalt

City of Windhoek Resealing of Streets in Windhoek – 1 TRA/128/2010 ASPHALT.

Streets

Process control site laboratory

Asphalt

City of Windhoek Resealing of Streets in Windhoek - TRA 95/2006.

Streets

Material survey

Borrow pit

Construction phase for the Finkenstein development near Windhoek.

Streets

Material survey

Borrow pit

Construction phase for the surfacing of streets in Rundu.

Structures

Geotechnical investigation

Rotary core drilling

New Silo And Pipe Gantry at the Van Eck Power Station, Windhoek (in association with ARQ)

Structures

Geotechnical investigation

Rotary core drilling

New Marine Safety Training Centre in Walvis Bay (in association with ARQ)

Structures

Geotechnical investigation

Test pitting

New 132 kV Load Centre at Eros (in association with ARQ)

Structures

Geotechnical investigation

Test pitting

Upgrading of Ujams Industrial Effluent Treatment Plant (in association with ARQ)

Structures

Geotechnical investigation

Test pitting

Nampower Hydro-electric Power Station Ruacana, new location for shed/workshop (in association with ARQ)

Structures

Geotechnical investigation

Test pitting

Sandberg River Embankment Construction, Mariental (in association with ARQ)

Structures

Geotechnical investigation

Test pitting

Settlement and cracking of  2 x 9 Ml and 1 x 7.5 Ml water reservoirs in Ovamboland

Structures

Geotechnical investigation

Earth resistivity measurements

New 220 KV powerline and substations from Wlotzkabaken to Khan Substation (in association with Geologic Solutions)

Structures

Geotechnical investigation

Test pitting

Two sites at Ruacana Power Station for Shed and Accommodation Facilities, Nampower (in association with ARQ)

Structures

Geotechnical investigation

Plate load testing

New Obib substation for Skorpion zinc (in association with Geologic Solutions)

Urban

Aerial photography

 

Otjiwarongo Municipality – Black & white 1: 10 000

Urban

Aerial photography

 

Farm Regenstein, colour 1:5 000 geo-referenced orthophoto’s

Urban

Aerial photography

 

Oshakati town area 12.5 x 5 km as well as Ondangwa town area 15 x 7.5 km and two strips between Ondangwa and Oshakati, colour 1:10 000 orthophoto’s