Engineering field |
Function |
Main activity |
Project |
Airports |
Acceptance control site laboratory |
Asphalt, earthworks, concrete |
Upgrading of Walvis Bay Airport. |
Airports |
Pavement investigation |
Asphalt core drilling |
Walvis Bay International Airport
– drilling of 930 asphalt
cores. |
Airports |
Acceptance control site laboratory |
Asphalt, earthworks |
Rehabilitation of Runways, Taxiways
and Related Works at Hosea Kutako
International Airport for Namibia
Airports Company
NAC/OPS/02/B/405/09. |
Airports |
Pavement investigation |
Asphalt core drilling, texture depth |
Hozea Kutako International Airport –
drilling of asphalt cores and
texture depth tests (sand patch). |
Airports |
Acceptance control site laboratory |
Earthworks, asphalt, concrete |
Upgrading and rehabilitation of
Walvisbay Airport. |
Airports |
Geotechnical investigation |
Plate load testing |
New Government Hangar at Eros
Airport, Windhoek (in association
with ARQ) |
Airports |
Geotechnical investigation |
Test pitting |
Swakopmund Airport Main Runway (in
association with ARQ) |
Airports |
Material survey |
Borrow pit |
Upgrading of Walvis Bay Airport |
Airports |
Material survey |
Borrow pit & centerline |
Upgrading of Walvis Bay Airport. |
Airports |
Aerial photography |
|
Lüderitz Aerodrome, black & white
1:10 000 orthophoto’s |
Airports |
Topographical Survey |
|
Upgrading of Walvis Bay Airport |
Bridges |
Acceptance control site laboratory |
Concrete, earthworks |
Construction of Three Bridges on
DR2102 Ovitoto – Otjozondjupa
Region. |
Bridges |
Acceptance control site laboratory |
Concrete, earthworks |
Construction of 2 Bridges for the
New Railway Line between Ondangwa
and Oshikango. |
Bridges |
Geotechnical investigation |
Rotary core drilling |
Construction of the Pipe Bridge
across the Swakop River: Swakop
South Water Supply Scheme (in
association with ARQ) |
Bridges |
Geotechnical investigation |
Dynamic Penetrometer Super Heavy |
New Bridge site for the access road
for Swakop Uranium Husab Mine |
Buildings |
Geotechnical investigation |
Test pitting |
New development on erf 6341, Feld
street, Windhoek (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling & CSW |
Extensions to National Council,
Windhoek (in association with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling & CSW |
G.M.H.R Development, Windhoek (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling |
New “City Junction” Development on
Erf 246, Windhoek (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling |
New Multi Storey Office Building for
the Ministry of Home Affairs on Erf
6971, Hosea Kutako Drive, Windhoek
(in association with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling |
Extensions to the Ministry of Labour
and Social Welfare Head Office,
Windhoek (in association with ARQ) |
Buildings |
Geotechnical investigation |
Dynamic Penetrometer Super Heavy |
New Jimmey Construction Offices in
Lazarett Street, Windhoek (in
association with ARQ) |
Buildings |
Geotechnical investigation |
|
Namibia Development Corporation Site
in Tsumeb |
Buildings |
Geotechnical investigation |
Rotary core drilling |
Construction of Auas Valley Shopping
Mall, Windhoek (in association with
ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling |
New Head Office for the Namibia
Airports Company located at Eros
Airport, Windhoek (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Rotary core drilling |
New Head Office for NAMPOL located
in Jan Jonker Street, Windhoek (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
New Head Office for the Ministry of
National Service, Youth and Sport,
Katutura, Windhoek (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
Upgrading of Anderson Gate and
Galston Gate in Etosha Park (assist
Kantey & Templer) |
Buildings |
Geotechnical investigation |
Continuous Surface Wave testing |
New Windhoek Mayor’s Office at the
Municipal Offices in Windhoek (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Dynamic Penetrometer Super Heavy |
New office development in Ballot
Street and feed mill at the new
poultry farm (Element) |
Buildings |
Geotechnical investigation |
Test pitting |
New Blue Marine / Bidvest Warehouse
in Windhoek (in association with
Blue Rock) |
Buildings |
Geotechnical investigation |
Test pitting |
New Development for the Millenium
Challenge Account at Helao Nafidi,
Oshakati & Gobabis (in association
with Blue Rock) |
Buildings |
Geotechnical investigation |
Continuous Surface Wave testing |
New UNAM Medical Faculty in Windhoek
(in association with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
New Carl List House Building (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
Extentions to Wernhill Shopping
Centre (in association with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
New Auditor General building located
in Robert Mugabe Ave, Windhoek |
Buildings |
Geotechnical investigation |
Test pitting |
New Additional Office Accommodation
Ministry of Finance Windhoek located
in Robert Mugabe Ave, Windhoek (in
association with Geologic Solutions) |
Buildings |
Geotechnical investigation |
Test pitting |
New buildings located at the
Suiderhof Army Base (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
New shopping centre on erven 6229
and 6230 Ongwediva (in association
with ARQ) |
Buildings |
Geotechnical investigation |
Dynamic Cone Penetrometer |
Severe deformation at the Standard
Bank building in Oshakati (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Test pitting |
New training facility at the
Okahandja Military Base (in
association with ARQ) |
Buildings |
Geotechnical investigation |
Plate load testing |
New City Council office in Oshakati
(in association with Geologic
Solutions) |
Hydrological |
Aerial photography |
|
Oshakati – Ogongo canal, black &
white 1: 6 000 – Namwater |
Mining |
QA/QC site laboratory |
Earthworks, concrete, seals |
Construction of B2 Gold mining
infrastructure Otjozondjupa Region. |
Mining |
Process control site laboratory |
Earthworks, concrete |
Construction works for the upgrading
of Tsumeb Smelter. |
Mining |
Audit function site laboratory |
Earthworks, concrete |
Construction of the maxi pad as well
as other infrastructure for AREVA at
Trekkopje Uranium Mine. |
Mining |
Process control site laboratory |
Earthworks, concrete |
Construction of the Water Pipeline
from Swakopmund to Trekkopje Uranium
Mine. |
Mining |
Process control site laboratory |
Earthworks |
Construction of the New Tailings Dam
at Langer Heinrich Uranium Mine. |
Mining |
Process control site laboratory |
Earthworks, concrete |
Construction of the Water Pipeline
from Swakopmund to Langer Heinrich
Uranium Mine. |
Mining |
QA/QC site laboratory |
Earthworks, concrete |
Main contract for acceptance control
testing for Anglo Base at the
Skorpion Zinc project near Rosh
Pinah. (3.2 BN$) |
Mining |
Process control site laboratory |
Earthworks, concrete |
Construction of the new pipeline and
reservoirs for Skorpion zinc. (45
km) |
Mining |
Geotechnical investigation |
Plate load testing |
New structures at Tsumeb Smelter for
GI Construction, Tsumeb |
Mining |
Geotechnical investigation |
Rotary core drilling |
Additional Swakop Uranium Husab Mine
relocated structures (in association
with ARQ) |
Mining |
Geotechnical investigation |
Test pitting |
Swakop Uranium Husab Mine
infrastructure and bulk water supply
pipeline (in association with ARQ) |
Mining |
Geotechnical investigation |
Plate load testing |
New reagents plant for Areva
Trekkopje Uranium Mine (Jones &
Wagener) |
Mining |
Geotechnical investigation |
Test pitting |
Trekkopje Uranium Heap Leach Maxi
Pad (in association with ARQ) |
Mining |
Geotechnical investigation |
Test pitting |
New water pipeline, booster sites
and reservoir sites from the
desalination plant at Wlotzkabaken
to the new uranium mine at Trekkopje
(in association with Geologic
Solutions) |
Mining |
Material survey |
Borrow pit & centerline |
Proposed new access road to Swakop
Uranium Husab mine |
Mining |
Topographical Survey |
|
Quantitative survey at Otjihase mine |
Mining |
Topographical Survey |
|
Proposed new sites for Kudu Gas to
Power project |
Mining |
Topographical Survey |
|
New site at Skorpion Zinc, Rosh
Pinah |
Ports |
Geotechnical investigation |
Seismic refraction and topographical survey |
Pre-feasibility study for the new
harbour development at Cape Fria in
the Skeleton Coast Park (in
association with Geologic Solutions) |
Railways |
Process control site laboratory |
Aggregate |
Production of 100,000 m3 railway
ballast for the Northern Region
Railway Project at Ongopolo Mine in
Tsumeb. |
Railways |
Acceptance control site laboratory |
Earthworks, concrete |
Construction of the New Railway Line
between Ondangwa and Oshikango (60
km). |
Railways |
Process control site laboratory |
Aggregate |
Production of 130,000 m3 railway
ballast at Keetmanshoop for the
railway between Aus and Lüderitz. |
Railways |
Process control site laboratory |
Earthworks, concrete |
Construction of the railway between
Aus and Luderitz. |
Railways |
Acceptance control site laboratory |
Earthworks, concrete |
Construction of the railway line
between Tsumeb and Ondangwa (3x on
site laboratories). (245 km’s) |
Railways |
Process control site laboratory |
Aggregate |
Production of 100,000 m3 railway
ballast at Aris for the Northern
Region Railway Project. |
Railways |
Geotechnical investigation |
Continuous Surface Wave testing |
Transnamib Station Development,
Windhoek (in association with ARQ) |
Railways |
Material survey |
Borrow pit & centerline |
Rehabilitation and upgrading of the
railway line between Kranzberg and
Tsumeb (400 km’s) |
Railways |
Material survey |
Borrow pit |
Construction of New railway line
between Ondangwa and Oshikango. (60
km’s) |
Railways |
Material survey |
Borrow pit & centerline |
Construction of new railway line
between Tsumeb and Ondangwa. (245
km’s) |
Railways |
Aerial photography |
|
Namibia Northern Railway Extension:
Ondangwa to Skeleton Coast, colour
1:20 000
orthophoto’s including 2 x 10
km strips north and south of Cape
Fria |
Railways |
Aerial photography |
|
1:40 000 colour orthophoto’s, Katima
Mulilo to Ohangwena and Rundu to
Grootfontein |
Railways |
Aerial photography |
|
1:10 000 colour orthophoto’s, 2
strips of area south of the road
between Oshakati and Ondangwa |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of MR91 Gobabis –
Aminius – Aranos 243 km, Omaheke and
Hardap Regions. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of DR3609 Oshakati –
Omungwelume – Ongenga 37.5 km,
Omusati Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of DR3608 Outapi -
Omafo – Omusati Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of MR67 Omakange -
Ruacana – Omusati Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of DR3524 Ngoma –
Nakabolelwa – Caprivi Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of MR125 Kongola –
Linyanti – Caprivi Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of DR3673 Omuthiya -
Onanke – Oshana Region. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of labour based project
DR3610 Mangetti – Oshana Region. |
Roads |
Process control site laboratory |
Earthworks, concrete, seals |
Construction of TR15/1 between
Tsumeb and Katwitwi. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of TR14/02
(Gobabis-Drimiopsis-Otjinene) 150
km. |
Roads |
Process control site laboratory |
Earthworks, concrete, seals |
Upgrading and rehabilitation of
TR7/1 Okahandja to Wilhelmstahl. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete |
Construction of Caprivi Labour Based
Projects DR3502, DR3507 and Sachinga
Quarantine Road (totaling 60 km). |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Construction of MR67 Kamanjab to
Omakange Phases 1 and 2. |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Rehabilitation and upgrading of MR
100 between Opuwo and MR 67 Junction
(60 km). |
Roads |
Process control site laboratory |
Earthworks, concrete, seals |
Rehabilitation of TR1/11 from
Ondangwa to Oshikango. (60km) |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, asphalt |
Rehabilitation and upgrading of TR
1/5 between Windhoek and Aris. (18
km’s) |
Roads |
Acceptance control site laboratory |
Earthworks, concrete, seals |
Rehabilitation and upgrading of TR
1/7 between Okahandja and
Otjiwarongo. (175 km’s) |
Roads |
Geotechnical investigation |
Test pitting |
Access Road and Rail for Swakop
Uranium Husab Mine (assist Jones &
Wagener) |
Roads |
Material survey |
Borrow pit & centerline |
Construction of MR91
(Gobabis-Aminius-Aranos) 243 km. |
Roads |
Material survey |
Borrow pit & centerline |
Construction of DR3609
(Oshakati-Omungwelume-Ongenga) 37.5
km. |
Roads |
Material survey |
Borrow pit |
Construction of MR67 (Omakange to
Ruacana) 85 km. |
Roads |
Material survey |
Borrow pit |
Construction of DR3608 (Outapi to
Omafo) 80 km. |
Roads |
Material survey |
Borrow pit & centerline |
Construction of MR125 (Kongola to
Linyanti) 115 km. |
Roads |
Material survey |
Borrow pit & centerline |
Construction of TR14/02
(Gobabis-Drimiopsis-Otjinene) 150
km. |
Roads |
Material survey |
Borrow pit |
Labour based project DR3673 Omuthiya
- Onenke - Ovamboland. |
Roads |
Material survey |
Borrow pit |
Labour based project DR3610 Mangetti
- Ovamboland. |
Roads |
Material survey |
Borrow pit |
Construction of Caprivi Labour Based
Projects DR3502, DR3507 and Sachinga
Quarantine Road (totaling 60 km). |
Roads |
Material survey |
Borrow pit & centerline |
Consrtruction of MR120 (Okatana –
Endola – Onuno) and MR123 (Outapi –
Tsandi – Junction MR122) |
Roads |
Material survey |
Borrow pit |
Construction of MR100 from MR 67 to
Opuwo. (55 km) |
Roads |
Material survey |
Borrow pit & centerline |
Construction of MR67 from Kamanjab
to MR122 Junction. (220 km) |
Roads |
Material survey |
Borrow pit & centerline |
Construction of MR122 from Okahao
to MR67 Junction. (109 km) |
Roads |
Material survey |
Borrow pit |
Rehabilitation of TR1/7 Okahandja to
Otjiwarongo. (174 km) |
Roads |
Topographical Survey |
|
Secondment of surveyor for the new
road between Opuwo and Omakange
MR100 |
Special projects |
|
|
WMF Werewolf Project- responsible
for site preparation and civil works
during the mine blast project with
the objective to investigate
Werewolf MKII compliance to NATO PIP
specifications |
Streets |
Acceptance control site laboratory |
Bitumen stabilized materials |
City of Windhoek Resealing of
Streets in Windhoek – TRA/146/2012
BSM Cold Insitu Recycling. |
Streets |
Acceptance control site laboratory |
Asphalt |
City of Windhoek Resealing of
Streets in Windhoek – 1 TRA/128/2010
ASPHALT. |
Streets |
Process control site laboratory |
Asphalt |
City of Windhoek Resealing of
Streets in Windhoek - TRA 95/2006. |
Streets |
Material survey |
Borrow pit |
Construction phase for the
Finkenstein development near
Windhoek. |
Streets |
Material survey |
Borrow pit |
Construction phase for the surfacing
of streets in Rundu. |
Structures |
Geotechnical investigation |
Rotary core drilling |
New Silo And Pipe Gantry at the Van
Eck Power Station, Windhoek (in
association with ARQ) |
Structures |
Geotechnical investigation |
Rotary core drilling |
New Marine Safety Training Centre in
Walvis Bay (in association with ARQ) |
Structures |
Geotechnical investigation |
Test pitting |
New 132 kV Load Centre at Eros (in
association with ARQ) |
Structures |
Geotechnical investigation |
Test pitting |
Upgrading of Ujams Industrial
Effluent Treatment Plant (in
association with ARQ) |
Structures |
Geotechnical investigation |
Test pitting |
Nampower Hydro-electric Power
Station Ruacana, new location for
shed/workshop (in association with
ARQ) |
Structures |
Geotechnical investigation |
Test pitting |
Sandberg River Embankment
Construction, Mariental (in
association with ARQ) |
Structures |
Geotechnical investigation |
Test pitting |
Settlement and cracking of
2 x 9 Ml and 1 x 7.5 Ml water
reservoirs in Ovamboland |
Structures |
Geotechnical investigation |
Earth resistivity measurements |
New 220 KV powerline and substations
from Wlotzkabaken to Khan Substation
(in association with Geologic
Solutions) |
Structures |
Geotechnical investigation |
Test pitting |
Two sites at Ruacana Power Station
for Shed and Accommodation
Facilities, Nampower (in association
with ARQ) |
Structures |
Geotechnical investigation |
Plate load testing |
New Obib substation for Skorpion
zinc (in association with Geologic
Solutions) |
Urban |
Aerial photography |
|
Otjiwarongo Municipality – Black &
white 1: 10 000 |
Urban |
Aerial photography |
|
Farm Regenstein, colour 1:5 000
geo-referenced orthophoto’s |
Urban |
Aerial photography |
|
Oshakati town area 12.5 x 5 km as
well as Ondangwa town area 15 x 7.5
km and two strips between Ondangwa
and Oshakati, colour 1:10 000
orthophoto’s |